Bellevue Hill, Swan By Bellevue

Swan By Bellevue consisted of a knock down (Demolition) of two homes on two different blocks of land. It eventuated into the construction of 13 Luxurious units. Through the use of concrete and Dincel for the core construction, combined with the façade of the building clad with a combination of Barestone Cemintel and Prodema Nux. The project took a total of 12 months from start to finish.